Infrastructure Planning and Development


Master Planning:Developing comprehensive long-term plans for the city's infrastructure, including roads, water supply, sewerage, drainage, and solid waste management systems.


Project Planning and Design:Planning, designing, and estimating costs for various infrastructure projects.


Construction Supervision:Supervising the construction of infrastructure projects to ensure quality and adherence to standards.


Maintenance of Infrastructure:Regularly inspecting and maintaining existing infrastructure to ensure its functionality and longevity.


Road Construction and Maintenance:Constructing, repairing, and maintaining roads, streets, and sidewalks.


Stormwater Drainage:Designing, constructing, and maintaining stormwater drainage systems to prevent flooding


Solid Waste Management:Planning and implementing solid waste collection, transportation, and disposal systems.


Street Lighting:Designing, installing, and maintaining street lighting systems.


Sewerage:Planning, designing, and operating sewerage systems, including sewage treatment plants and sewer networks.


Water Supply

Planning, designing, and operating water supply systems, including water treatment plants and distribution networks.


Map representing Raw water transmission mains from Undavalli to Takkelapadu WTP



Map representing Water supply distribution system in Guntur Municipal Corporation



Water Treatment Facilities

  • Filtration Plants: 4 No.’s
  • Installed Capacity: 157.20 MLD
  • Net Present Supply: 149.50 MLD @ 135 LPCD

Distribution Network

  • Total Road Network: 1350 Kms (including NH & SH)
  • Length of Pumping Main: 96 Kms
  • Length of Distribution Network: 1013 Kms

Service Reservoirs

  • No. of ELSRs / GLSRs: 41
  • Total Capacity: 52,058 KL

House Service Connections

  • Total Assessments: 213,270 Nos.
  • Assessments with HSCs: 154,825 Nos.
  • HSCs: 150,857, Metered: 3,968

Water Quality Testing Labs

 

No of
labs

 

Location

 

List of tests conducted

 

No. of labs

 

Location

 

List of tests conducted
ULBS OWN LAB

1

Narasaraopet
Road, Guntur

Residual Chlorine, Turbidity, PH, Electrical conductivity, TDS, Ammoniacal Nitrogen, Nitrate, Hardness, Alkalinity

 

1

Head water works Takkelapadu, Guntur

Residual Chlorine, Turbidity, PH, Electrical conductivity, TDS, Ammoniacal Nitrogen

Water Supply Distribution Within the Town

  • Total No. of Elevated Level Reservoirs: 25 Existing + 16 APMDP
  • Total Capacity of all Reservoirs: 50.26 ML
  • Total No. of Bore Wells: 1665 (Working: 1589)
  • Total No. of Open Wells: 97
  • Total No. of Public Stand Posts: 2,945
  • Total No. of Households: 178,372 Nos.
  • No. of H.S. Connections: 107,893 Nos.
  • Tap Rate: 104,221 Nos.
  • Meter Rate: 3,672 Nos.